Tunnel construction with TBM tunnel boring machines in South America

Authors

  • Alejandro Palma SRK Consulting, Chile
  • John Hughes SRK Consulting, Chile
  • Diego Gajardo SRK Consulting, Chile

DOI:

https://doi.org/10.21703/0718-2813.2010.7.3710

Keywords:

Tunnel Boring Machine TBM, drill and blast, tunneling projects

Abstract

The use of Tunnel Boring Machines (TBMs) in South America has been and still is significant. There have been two or more major and successful projects using TBMs in countries such as Peru and Ecuador but not yet in Chile, where the application of this technology has been until very recently almost non-existent. This article aims to explain those tunnels in South America excavated with TBMs, focusing on recent Chilean TBM projects. The need to implement more quickly current and future projects with underground construction elements in the Chilean mining, electrical generating industries together with underground transport schemes, dictate a need for continuing adoption of this technology for the construction of tunnels.

 

References

Babendererde, L. (2002). Weser Tunnel – Project Brochure Babendererde Engineers

Brox, D., Valentino, R. and Venturini, G. (2009). Technical Consideration for TBM Tunnelling in the Andes. Canadian Tunnelling Magazine, 32- 37

Budini, N. (1994). Descripción y Aplicación del Sistema de Trabajo del Equipo TBM. Memoria de Título USACH

Chiti, B. (1994). Excavación con Tunelera, Primera Experiencia en Chile. Memoria de Título, USACH

Giraldo, M. y Ortíz, O. (2008). Productividad de las Máquinas Tuneleras Tipo TBM vs tipo de roca. Revista del Instituto de Investigaciones FIGMMG

Isaksson, T. (2002). Model for Estimation of Time and Cost based on Risk Evaluation Applied on Tunnel Project. Royal Institute of Soil and Rock Mechanics, Stockholm, Sweden

José Cartellone Construcciones Civiles (2000). Ficha Técnica del Proyecto Hidroeléctrico Chimay

Maidl, B., Schmid, L., Ritz, W. and Herrenknecht, M. (2008). Hardrock Tunnel Boring Machines. Ernst & Sohn

Tricamo, A. (2005). San Francisco Hydroelectric Project. Class of Support and TBM Operation – Case Hystory

Tunnels & Tunnelling International (2003). Trials and Tumult at Yucán HEP, June, 16 - 19

Tunnel Talk (2010). www.tunneltalk.com (reportaje a Central Hidroeléctrica Chacayes – Túnel Cipreses)

Downloads

Published

2010-06-01

Issue

Section

Articles

How to Cite

Tunnel construction with TBM tunnel boring machines in South America. (2010). Obras Y Proyectos, 7, 4-14. https://doi.org/10.21703/0718-2813.2010.7.3710