BIM 5D methodology implementation proposal for industrial foundation works in the Oxygen Plant in Arauco
DOI:
https://doi.org/10.4067/S0718-28132021000200074Keywords:
Management of information, Methodology, BIM 5D, Civil works, CostsAbstract
Due to the growth of the architecture, engineering and construction industry (AEC), it is essential to update the work methodologies, especially in the design and construction stage, since this is where the cost of the project is concentrated. The main objective is the management of information for the prevention of errors and the correct execution of the project. This document proposes a strategy for the implementation of the BIM methodology in 5D, including a 3D model, time and cost, in an industrial construction company, specifically in civil works. This strategy was designed on the basis of the Oxygen Plant project, in order to establish the steps of the methodology. To then apply the BIM methodology in the project, evidencing the cost benefits of the activities and estimating the cost of BIM implementation.
References
AIA (2013). Building Information Modeling Protocol Form G202-2013. American Institute of Architects AIA (http://www.aia.org), Washington DC, USA.
Aliaga Melo, G. (2012). Implementación y metodología para la elaboración de modelos BIM para su aplicación en proyectos industriales multidisciplinarios. Proyecto de título de Ingeniero Civil, Universidad de Chile, Santiago, Chile.
CORFO (2015). Plan BIM Chile. Construye 2025. Santiago, Chile (https://planbim.cl).
Eastman, C., Teicholz, P., Sacks, R. and Liston, K. (2018). BIM handbook: A guide to building information modeling for owners, managers, designers, engineers and contractors. John Wiley & Sons. USA.
Forgues, D., Iordanova, I., Valdivesio, F. and Staub-French, S. (2012). Rethinking the cost estimating process through 5D BIM: A case study. Construction Research Congress 2012: Construction Challenges in a Flat World, West Lafayette, Indiana, USA, 778-786.
Hasan, A.N. and Rasheed, S.M. (2019). The benefits of and challenges to implement 5D BIM in construction industry. Civil Engineering Journal 5(2), 412-421.
ISO 19650-1 (2018). Organización de la información sobre trabajos de construcción – Gestión de la información en el uso del BIM, Parte 1: Conceptos y principios. Ginebra, Suiza.
ISO 19650-2 (2018). Organización de la información sobre trabajos de construcción – Gestión de la información en el uso del BIM, Parte 2: Fase de diseño y producción de los inmuebles. Ginebra, Suiza.
Kim, K.P., Ma, T., Baryah, A.S., Zhang, C. and Hui, K.M. (2016). Investigation of readiness for 4D and 5D BIM adoption in the Australian construction industry. Management Review: An International Journal 11(2), 43-64.
Montilla, A. (2017). Las claves para implantar BIM en una empresa española. https://revistadigital.inesem.es/diseno-yartes-graficas/implantacionbim/
Pape, H. y Nazer, A. (2021). Determinantes de la innovación en empresas constructoras de la Región de Atacama, Chile. Obras y Proyectos 29, 80-92.
Plan BIM (2017). Roles en BIM. Corporacion de Desarrollo Tecnológico CDT, CORFO. Santiago, Chile.
PMG (2018). Diagnóstico de la situacion actual de formacion de capital humano en BIM en Chile. Consultora PMG, Santiago, Chile.
Trejo Carvajal, N.A. (2018). Estudio de impacto del uso de la metodologia BIM en la planificación y control de proyectos de ingeniería y construcción. Proyecto de título de Ingeniero Civil, Universidad de Chile. Santiago, Chile.
Stanley, R. and Thurnell, D. (2014). The benefits of, and barriers to, implementation of 5D BIM for quantity surveying in New Zealand. Australasian Journal of Construction Economics and Building 14(1), 105-117.